1.2 kilometres - Our rolling mill in Völklingen

The view from the A620 motorway across the Saar is already impressive: the 1.2 kilometre long halls of the bar steel centre Nauweiler represent a further technological highlight at the Völklingen location. Thanks to a consistent series of investments, the plant has reached a level of performance that positions it internationally as a strategic steel supplier for highly sophisticated industrial sectors.

  • Capacity: 500,000 tonnes / year

  • Diameter test with laser diameter

  • Surface test (magnet powder testing)

  • Internal defect test (ultrasonic testing)

  • Temperature-controlled rolling

Google

Saarstahl Walzwerk Völklingen

+49 6898 100 Send email